Tuesday, October 25, 2005

12. The Plumbing Rough In - Day 1

The plumbing rough in is well, the plumbing rough in. This is where they go and find all the pipes and tubing that was put in before the concrete slab was poured. They then sometimes have to bust out the concrete to find those pipes. Fascinating stuff. I wonder if they have PVC pipe detector to help find them under the concrete because I forgot where they where buried. It was also a surprise today to see that two of my iron bathtubs where installed. They look great.





No comments: